Skip to main content
  • City of PORTSMOUTH NH
  • Department of Public Works
A A A
Department of Public Works
  • Operations Back Copy Created with Sketch.
    • Engineering
    • Geographic Information Systems
    • Parks & Greenery
    • ParkPortsmouth
    • Recycling Center & Solid Waste
    • Roads & Sidewalks
    • Stormwater
    • Transportation
    • Wastewater & Sewer
    • Water
  • Services Back Copy Created with Sketch.
    • Snowstorm Parking Info
    • Recycling Center
    • Waste Collection Schedule
    • Drinking Water Quality
    • Mosquito Control
    • Household Hazardous Waste Day
  • Resources Back Copy Created with Sketch.
    • Adopt-A-Spot
    • Billing Information
    • Catch Basins & Fire Hydrants
    • Permits & Applications
    • Portsmouth Click N' Fix
    • Post-Closure Landfill Monitoring
    • Water & Sewer Assistance Program
    • Snow Related Impacts & Notifications (CodeRED)
    • Water Efficiency Rebate Program
  • Projects Back Copy Created with Sketch.
    • Citywide Map
    • Capital Improvement Plan
    • Bartlett Street
    • Community Campus
    • Community Policing Facility
    • Corporate Drive
    • Fleet Street Area
    • Greenleaf-Lafayette Rd.
    • Hampshire & Essex
    • Hanover Garage
    • Islington Street
    • Marjorie Street Pump Station
    • Maplewood Ave. Bridge
    • Mechanic St. Pump Station
    • Middle/Miller/Summer St
    • North/Union Cemetery Seawall
    • Pease Water
    • Peirce Island WWTF
    • Peirce Island Road Resiliency
    • Peirce Island Outdoor Pool
    • Peverly Hill Road
    • Rail Trail
    • Sagamore Avenue
    • Sidewalks
    • Sound Barriers
    • South Mill Pond Playground
    • Union Street Sewer Separation
    • Willard Ave. Sewer
    • Woodbury Ave.
    • Other Projects
    • Skate Park
    • Fleet Street Sewer Separation
  • MapGeo
  • Contact
  • Developments
  • City of Portsmouth
  • Public Works Home
  • Peirce Island Outdoor Pool

Peirce Island Outdoor Pool

This legacy project that affects one of the City's prime assets and most popular benefits is intended to assure that the 1-million gallon outdoor pool can be enjoyed by the citizens of Portsmouth for the next 40 years. 

The project includes improvements to the aquatics, mechanical systems and pool structure. The project was divided into two phases, with active outside construction scheduled during the off-season so as not to interrupt the seasonal operation of the outdoor pool (June-August). Those phases include:

  • The construction of a new pump house/chemical building that will house the mechanical systems and piping for filtration and chemicals necessary for operation. The old chemical building will be removed. 
  • The reconstruction of the entire pool, including a new liner, perimeter gutter and new deck surrounding the entire pool.

 UPDATE (July 2024)

  • The new pump house building is complete and the construction site fenced off awaiting the installation of the new mechanical systems.
  • Work is starting to plumb the building for the new pool filtering and treatment equipment. 
  • The roof will be installed starting the week of July 8. 
  • The old chemical building will be removed.
  • The work on the pool and deck will begin once the pool operations conclude for the summer.

The project is part of the Peirce Island Master Plan adopted in 1999.

  • City of PORTSMOUTH Home >
blue public works seal

Department of Public Works

Home Office
680 Peverly Hill Rd, Portsmouth, NH 03801
Hours

Monday – Friday 7:30 AM - 3:30 PM

Phone
(603) 427-1530
Fax
(603) 427-1539

Resources

  • Drinking Water
  • Forms & Permits
  • Click N' Fix
  • Contact
blue public works seal

© 2024 - City of Portsmouth. All Rights Reserved. | Terms of Use